3
|
Components
Service manual
72
250D7Y1B
Sky Air Advance-series
ESIE19-13A – 2020.05
b
a
a
Expansion valve body
b
Expansion valve pipe
3
Remove the expansion valve body.
4
Supply nitrogen to the refrigerant circuit. The nitrogen pressure MUST NOT
exceed 0.02 MPa.
5
Heat the ends of the expansion valve pipes using an oxygen acetylene torch
and remove the expansion valve pipe ends.
6
Stop the nitrogen supply when the piping has cooled down.
7
To install the expansion valve body, see
To install the expansion valve body
1
Install the expansion valve body in the correct location and correctly oriented.
2
Supply nitrogen to the refrigerant circuit. The nitrogen pressure MUST NOT
exceed 0.02 MPa.
3
Wrap a wet rag around the expansion valve body and solder the refrigerant
pipes to the expansion valve body.
CAUTION
Overheating the valve will damage or destroy it.
4
After soldering is done, stop the nitrogen supply after the component has
cooled‑down.
Summary of Contents for Sky Air Advance RZA200D7Y1B
Page 1: ...Service manual Sky Air Advance series RZA200D7Y1B RZA250D7Y1B ...
Page 190: ......
Page 191: ......
Page 192: ...ESIE19 13A 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...