3
|
Components
Service manual
125
250D7Y1B
Sky Air Advance-series
ESIE19-13A – 2020.05
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
Prerequisite:
If needed, remove any parts or insulation to create more space for
the removal.
1
Remove the screws that fix the solenoid valve to the bracket.
b
a
c
d
e
a
Screw
b
Solenoid valve coil
c
Bracket
d
Screw
e
Solenoid valve body
2
Remove the screw that fixes the solenoid valve coil to the solenoid valve body.
3
Remove the solenoid valve coil from the solenoid valve body.
4
Disconnect the solenoid valve connector from the main PCB.
5
Cut all tie straps that fix the solenoid valve harness.
6
To install the solenoid valve coil, see
To remove the solenoid valve body
Prerequisite:
Recuperate the refrigerant from the refrigerant circuit, see
Prerequisite:
If needed, remove any parts or insulation to create more space for
the removal.
1
Remove the solenoid valve coil, see
124].
2
Cut the solenoid valve body pipes using a pipe cutter.
Summary of Contents for Sky Air Advance RZA200D7Y1B
Page 1: ...Service manual Sky Air Advance series RZA200D7Y1B RZA250D7Y1B ...
Page 190: ......
Page 191: ......
Page 192: ...ESIE19 13A 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...