3
|
Components
Service manual
94
250D7Y1B
Sky Air Advance-series
ESIE19-13A – 2020.05
2
Supply nitrogen to the refrigerant circuit. The nitrogen pressure MUST NOT
exceed 0.02 MPa.
3
Wrap a wet rag around the low pressure switch and solder the low pressure
switch pipe to the low pressure switch.
a
b
a
Low pressure switch
b
Low pressure switch pipe
CAUTION
Overheating the pressure switch will damage or destroy it.
4
After soldering is done, stop the nitrogen supply after the component has
cooled‑down.
5
Install the brackets and clip on the low pressure switch and pipe.
6
Install and tighten the screws.
b
b
a
a
c
a
Screw
b
Bracket
c
Clip
7
Route the low pressure switch harness towards the appropriate PCB.
8
Fix the harness using new tie straps.
9
Connect the low pressure switch connector to the appropriate PCB.
Summary of Contents for Sky Air Advance RZA200D7Y1B
Page 1: ...Service manual Sky Air Advance series RZA200D7Y1B RZA250D7Y1B ...
Page 190: ......
Page 191: ......
Page 192: ...ESIE19 13A 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...