3
|
Components
Service manual
104
250D7Y1B
Sky Air Advance-series
ESIE19-13A – 2020.05
1
Check that all wires are properly connected and that all connectors are fully
plugged‑in.
2
Check that no connectors or wires are damaged.
3
Check that the wiring corresponds with the wiring diagram, see
151].
INFORMATION
Correct the wiring as needed.
Is the problem solved?
Action
Yes
No further actions required.
No
PCB and continue with the next
procedure.
To check the fuses of the noise filter PCB
Prerequisite:
First perform all earlier checks of the noise filter PCB, see
1
Measure the continuity of the fuse. If no continuity is measured, the fuse has
blown.
a
b
a
Fuse F101U
b
Fuse F102U
Blown fuse on the noise filter PCB?
Action
Yes
Replace the noise filter PCB, see
No
PCB and continue with the next
procedure.
Summary of Contents for Sky Air Advance RZA200D7Y1B
Page 1: ...Service manual Sky Air Advance series RZA200D7Y1B RZA250D7Y1B ...
Page 190: ......
Page 191: ......
Page 192: ...ESIE19 13A 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...