Chapter 5 Web GUI Setup and Monitoring
176
State
Description
D/R in progress (Transport
Only)
The disaster recovery is in progress and the unit is using
the disaster recovery profile configured by the uplink.
The unit receives the search path with backup transport
only. However, the amount of data for the backup plan
service in the Disaster Recovery Table (DRT) exceeds the
allowable limit from the current unit. Contact your PNC
uplink administrator to reduce the amount of backup
plan IDs in the Uplink Configuration.
D/R in progress (No search
path)
The disaster recovery is in progress, but the unit is not
ready for disaster recovery due to a missing search path
from the PNC uplink. The following is a list of the
possible reasons:
Tuning descriptors in the DRT is empty. As a result,
there is no match for the origin.
The tuning descriptors in the DRT consists of only
one tuning parameter, which matches with the
origin. Since other tuning descriptors are empty,
there are no transports for the search path.
Contact your PNC uplink administrator.
D/R in progress - D/R Not
Ready (Malformed DRT)
The disaster recovery is in progress, but the unit is not
ready for disaster recovery due to a the DRT received
from the uplink is malformed. The following is a list of
the possible reasons:
DRT Valid flag in the DRT is set to FALSE.
Customer code in the ADP does not match the
customer code in the DRT header.
Disaster ID in the ADP does not match the ID in the
DRT header.
Contact your PNC uplink administrator.
NIT Retune Recovery in
progress
The NIT retune recovery is in progress. For more
information on NIT retune, see
NIT Retune Recovery
(on
page 10).
Summary of Contents for D9824
Page 22: ......
Page 26: ...Chapter 1 Introduction 4 On Screen Display support on baseband output NIT Retune Recovery ...
Page 40: ......
Page 164: ......
Page 306: ......
Page 368: ......
Page 370: ......
Page 388: ......
Page 410: ...Appendix C Compliance 388 Declarationof Conformity ...
Page 415: ......