Chapter 6
Performing the Pure Dye Calibration
Analyzing the Pure Dye Calibration Data
78
Applied Biosystems 7300/7500/7500 Fast Real-Time PCR System Installation and Maintenance Guide
Notes
5.
In the pure dye plate document:
a.
Select the
Results
tab.
b.
Select the
Spectra
tab.
6.
Select all wells of the plate document by clicking
the upper-left corner of the plate grid.
If the software displays:
Do this:
Pure Spectra Extraction Complete
– The analysis is
successful.
Click
, then go to
.
IMPORTANT!
The pure dye calibration is not complete
at this point. Before closing the plate document you must
inspect the Spectra plot as explained in
Repair Message
Click
, then go to
. (For information on
how the software auto-repairs calibration spectra, see
“About Pure Dye Spectra” on page 79
Error Message
Click
, load the plate, then run the pure dye
plate again.
If the calibration continues to fail, perform the calibration
with a new pure dye plate.
a
b
Click
Summary of Contents for 7300
Page 173: ......