11 . Connecting the Dry Air Unit (Option)
71
MF-C2000A Series
Chapter 2 Connections and Preparations of Each Section
Introduction Part
Inst
allat
ion and
Preparation Part
Operating Part
Maintenance Part
Appendixes
11 . Connecting the Dry Air Unit (Option)
The dry air unit (option) supplies dry air inside of the equipment and dehumidify the
interior.
It can be installed at the time of purchase or later. When it is installed later, our engi-
neer makes wiring and internal air piping connection, enables the option setting, and
changes the chiller parameters.
The work performed by customers after the dry air unit is installed is as follows.
Item required
Spanner (6 mm), tube for dry air (φ8)
*1
and recommended dry air
*2
*1 The destination coupling is MCLPTK8-1 (MISUMI) or equivalent.
*2 The recommended dry air is as follows. The non-recommended dry air may ad-
versely affect the filter effect and durability.
Temperature
20 to 35°C
Air pressure
0.5 to 0.7 MPa
Flow rate
30 NL/min. or more (filter inflow end)
Compressed air
quality class
Equivalent to 7,9,4 or lower (ISO8573-1:2010 (JIS B8392-1:2012))
Operating Procedure
(1) Insert the air tube from the dry air supply source.
To internal piping
φ8 air tube
Summary of Contents for MF-C2000A Series
Page 1: ...AA04OM1209213 07 FIBER LASER WELDER MF C2000A Series OPERATION MANUAL ...
Page 21: ...Introduction Part ...
Page 22: ......
Page 34: ......
Page 42: ......
Page 43: ...Installation and Preparation Part ...
Page 44: ......
Page 73: ...Operating Part ...
Page 74: ......
Page 78: ......
Page 142: ......
Page 212: ......
Page 213: ...Maintenance Part ...
Page 214: ......
Page 232: ......
Page 244: ......
Page 245: ...Appendixes ...
Page 246: ......