
Q00180 Rev B
Page 226 of 244
"Note: Copies are uncontrolled documents - For revision verification see the Master Documentation List"
6.
Remove MTP Bolster Plate from the system
7.
Reverse all previous disassembly steps for completing installation
System Verification:
STEPS:
1.
Reconnect the main AC power cord from the rear of the SmartCart SP or plug into the wall source.
2.
Place AC circuit breaker, located at the rear of the SmartCart SP, in the “
1
” (ON) position.
3.
Attach transducers to each of the MTP ports and verify full system operation in all modes
4.
Verification is complete – return system to normal operation.
20.3.11 Gas spring - Removal/Replacement (SmartCart SP)
Required Parts
Содержание Z.one Ultra SP
Страница 1: ......