
Q00180 Rev B
Page 195 of 244
"Note: Copies are uncontrolled documents - For revision verification see the Master Documentation List"
6.
Tilt the top of the display towards the rear of the cart to support the LCD Display while
removing the last screw.
7.
Slowly lift the Display off the metal hinge assy – while supporting it, gently remove the
display cable from the display (this may need to be gently pried away with a screwdriver)
8.
Once the cable is free, set the display aside and prepare for installation
Display Arm Removal:
STEPS:
1.
Remove the four (4) 6mm Allen Head Bolts which hold the display arm to the chassis.
2.
While gently pulling the video cable free from the system, remove arm assembly.
Display Arm Installation:
STEPS:
1.
Route the display cables and ground cable down into the chassis of the SmartCart SP, allowing
adequate slack in the required areas.
2.
Secure the cables with tie-wraps, as per locations removed previously during the disassembly
process.
3.
Reinstall the four (4) 6mm Allen Head screws to secure the display arm to the chassis.
Display Assy Installation:
STEPS:
1.
Reverse the steps performed in the removal process, for installation.
Содержание Z.one Ultra SP
Страница 1: ......