TT-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
50 of 198
SECTION 10: UPRIGHT STAND
10.1 Upri
g
ht Stand
A stand can
b
e
u
sed on an
u
pright air handler
w
hich
w
ill
b
e installed on a concrete sla
b
or on the floor. For
models TT112 - TT221 stand height is 36" (91.4 cm);
for model TT224 stand height is 46" (116.8 cm); for
model TT230 stand height is 47" (119.4 cm); for
models TT233 and TT236 stand height is 55" (139.7
cm). The stand m
u
st first
b
e fastened to the concrete
sla
b
or floor
b
efore the air handler is mo
u
nted
u
pon
it.
10.2 Upri
g
ht Stand Installation
To attach the stand to a concrete sla
b
, it m
u
st
b
e
sec
u
red
w
ith the
u
se of st
u
ds em
b
edded in the
concrete. Fo
u
r st
u
ds m
u
st
b
e installed in the sla
b
,
one for each corner of the stand. Q
u
antity 4,
maxim
u
m size 3/4" (19.1 cm) For models TT112 -
TT218, the mo
u
nting holes are to
b
e field-drilled for
installation of the st
u
ds. For models TT224 - TT236,
the stand has fo
u
r 3/4"(19.1 cm) holes drilled thro
u
gh
the stand pads.
See Page 54, Figure 49
. A st
u
d
(pro
v
ided
b
y others) m
u
st
b
e installed in the sla
b
for
each hole. Fasten the stand to the sla
b
w
ith fo
u
r hex
n
u
ts
w
ith flat and lock
w
ashers (pro
v
ided
b
y others).
10.3 Attachin
g
Air Handler to Stand
Once the stand is sec
u
red to a concrete sla
b
, the air
handler may
b
e placed on the stand. Prior to lifting
the air handler, apply a ½" (1.27 cm) thick do
ub
le-
sided
u
rethane foam tape (pro
v
ided
b
y others) to the
top edge of the stand. Lift the air handler on to the
mo
u
nting stand.
See Page 27, Section 6.1
for safe
lifting practices. Once the air handler is placed on the
stand, sec
u
re it
w
ith the pro
v
ided hard
w
are per
recommended torq
u
e settings.
See Page 10, Section
1
After placing the air handler on the mo
u
nting stand,
seams
b
et
w
een the mo
u
nting stand and the air
handler m
u
st
b
e properly ca
u
lked (ca
u
lk pro
v
ided
b
y
others).
NOTE:
If
u
sing the filter section
w
ith the
u
pright air
handler and stand, the filter section m
u
st
b
e set do
w
n
onto the stand
b
efore the air handler is mo
u
nted on
the stand. The 1/2" (1.27 cm) thick do
ub
le-sided
u
rethane foam tape sho
u
ld
b
e applied
b
et
w
een the
stand and the filter section.
Crush Hazard
Use proper lifting
equipment and
practices.
Falling Hazard
Use proper safety
equipment and prac-
tices to avoid falling.
Severe Injury Hazard
Use proper lifting
practices and equip-
ment.
Equipment and
accessories are
heavy.
Cut/Pinch Hazard
Wear protective gear
during installation,
operation and
service.
Edges are sharp.
WARNING
Failure to follow these instructions can result in death, injury or property damage.
Содержание TT Series
Страница 2: ......
Страница 4: ......
Страница 136: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 130 of 198 FIGURE 114 Regulator RV61 ...
Страница 167: ...SECTION27 TROUBLESHOOTING 161 of 198 ...
Страница 175: ...SECTION27 TROUBLESHOOTING 169 of 198 ...
Страница 176: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 170 of 198 27 7 2 Series 94 Field Service Checklist ...
Страница 177: ...SECTION27 TROUBLESHOOTING 171 of 198 ...
Страница 198: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 192 of 198 ...
Страница 202: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 196 of 198 ...
Страница 203: ...SECTION 28 THE WEATHER RITE TT SERIES WARRANTY 197 of 198 ...
Страница 204: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 198 of 198 ...