SECTION 24: S
TART
-
UP
P
ROCEDURES
127 of 198
finger tips.
24.5 Gas Pipin
g
and Initial Pressure Settin
g
s
1. Perform
a
press
u
re test on all gas s
u
pply lines
to the air handler per applica
b
le codes.
Make sure to isolate all
g
as controls before
pressure testin
g
the system.
2.
Verify s
u
pply press
u
re does not exceed maxi-
m
u
m rated gas press
u
re as stated on the rating
plate.
3.
Set the s
u
pply gas press
u
re at the step do
w
n
reg
u
lator (normally o
u
tside of the enclos
u
re if
one is installed) according to the name plate
rating inlet gas press
u
re specifications.
4.
Only after performing steps 1-3 a
b
o
v
e,
v
erify
pilot press
u
re.
• Place a
u
-t
ub
e manometer or gas press
u
re
ga
u
ge on the tee at the do
w
nstream side of
the pilot press
u
re reg
u
lator.
See Page 128,
Section 112
.
• Open the main gas
v
al
v
e and close the gas
v
al
v
e do
w
nstream of the MR
v
al
v
e.
• Start the air handler in the
w
inter mode and
adj
u
st the pilot press
u
re reg
u
lator to 3.5 in
W.C. for nat
u
ral gas or 9 to 11 in W.C. for LPG.
• Verify that the
bu
rner flame control has a
flame signal of 5.0 to 10VDC.
5. Adj
u
st air handler high fire gas press
u
re.
• Force the
bu
rner into high fire.
See Page 140,
Table 42
or
See Page 125, Section 24.4.2.1
through Page 126, Section 24.4.2.2
. for the
specific amplifier and action req
u
ired to place
it into high fire mode.
• Open
b
oth man
u
al gas
v
al
v
es at the air
handler.
• Begin
b
y remo
v
ing high fire adj
u
stment cap,
see Page 129, Figure 113
, and rotating the
reg
u
lator adj
u
stment scre
w
. A clock
w
ise
rotation increases manifold press
u
re.
• For air handlers eq
u
ipped
w
ith less than 1
MBH gas trains, the high fire gas press
u
re is
set
b
y adj
u
sting the reg
u
lator
u
pstream of the
M611
v
al
v
e.
See Page 131, Figure 115
.
• Reconnect any
w
ires that
w
ere
u
sed for
adj
u
stment.
6. Lo
w
Fire Adj
u
stment
•
NOTE:
High fire gas press
u
re m
u
st
b
e set
BEFORE adj
u
sting lo
w
fire. There are three
critical items to consider
b
efore adj
u
sting lo
w
fire:
A. Lo
w
fire adj
u
stment does not reg
u
late gas
press
u
re.
B. If the lo
w
fire adj
u
stment scre
w
is set to
maxim
u
m, high fire reg
u
lation pro
b
lems
w
ill
occ
u
r.
C. The
bu
rner control system m
u
st
b
e forced
into lo
w
fire. See Page 151, Ta
b
le 42 or See
Page 136, Section 24.4.2.1 thro
u
gh Page 137,
Section 24.4.2.2. for the specific amplifier and
action req
u
ired to place it into lo
w
fire mode.
• Lo
w
fire is set at the MR212
v
al
v
e
u
sing the
adj
u
stment scre
w
u
nder the lo
w
fire.
Adj
u
stment cap scre
w
(loosen locking scre
w
b
efore adj
u
stment),
see Page 129, Figure 113
or on the M611
v
al
v
e
u
sing the
b
rass adj
u
sting
scre
w
on the front side,
see Page 128, Figure
112
. Rotate the adj
u
stment scre
w
u
ntil there is
a contin
u
o
u
s
b
l
u
e ri
bb
on across the entire
bu
rner. A co
u
nter clock
w
ise rotation increases
the flame size. Lo
w
fire temperat
u
re rise m
u
st
not exceed 12 °F (7 °C). Tighten locking scre
w
w
hen finished.
• Reconnect any
w
ires that
w
ere remo
v
ed for
adj
u
stment.
7.
Once gas press
u
re and high/lo
w
fire adj
u
st-
ments are made, the gas set
u
p is completed.
All taps and instr
u
ments m
u
st
b
e remo
v
ed
and all caps and pl
u
gs m
u
st
b
e replaced.
Содержание TT Series
Страница 2: ......
Страница 4: ......
Страница 136: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 130 of 198 FIGURE 114 Regulator RV61 ...
Страница 167: ...SECTION27 TROUBLESHOOTING 161 of 198 ...
Страница 175: ...SECTION27 TROUBLESHOOTING 169 of 198 ...
Страница 176: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 170 of 198 27 7 2 Series 94 Field Service Checklist ...
Страница 177: ...SECTION27 TROUBLESHOOTING 171 of 198 ...
Страница 198: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 192 of 198 ...
Страница 202: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 196 of 198 ...
Страница 203: ...SECTION 28 THE WEATHER RITE TT SERIES WARRANTY 197 of 198 ...
Страница 204: ...TT SERIES INSTALLATION OPERATION AND SERVICE MANUAL 198 of 198 ...