Page 54
T47541109 Rev. J
FlexJet Head Assembly
TECHNICAL
PUBLICATIONS
This Document Supports Assembly 47541109 Rev. F
c.
Verify proper cable orientation and attach the Camera Cable
Assembly to the PCA Flex Jet Control. Refer to the following
diagram.
7 CCD Camera Assembly Cable Port
d.
Tighten the Stiffener screws and torque them to 80 inch-ounces
(0,56 NM)..
Install the FlexJet Head
Refer to the Installing a FlexJet Head section of this module to install the
FlexJet head on the platform machine in its previous location before
Comprehensive Head Maintenance was performed.
Final Steps
1.
Complete the steps in the Prepare the Machine for Production section
of this document to ensure that the machine is in a safe operational
state. Verify that all covers removed for maintenance are installed,
including the safety covers below the hinged covers.
2.
Complete the Setting the Touch-Down Sensors section of this module.
3.
Perform the Spindle-Height Calibration and Mirror Calibration. Refer
to the Calibration, CPE and Measurement manual.
4.
Perform Calibration Placement Enhancement (CPE), which is required
after removing and then installing the FlexJet back to the previous
position on the machine. Refer to the Calibration, CPE and
Measurement manual and perform CPE for FlexJet to ensure specified
placement accuracy. It is also recommended to dry cycle to verify
head performance before running full production.