![UIC GSM FlexJet Скачать руководство пользователя страница 83](http://html1.mh-extra.com/html/uic/gsm-flexjet/gsm-flexjet_manual_3277471083.webp)
Page 78
T47541109 Rev. J
FlexJet Head Assembly
TECHNICAL
PUBLICATIONS
This Document Supports Assembly 47541109 Rev. F
4.
Loosen the adjustment screw on the Tensioner Assembly, let it self-
adjust the belt tension, and tighten the screw.
5.
Install the Z Stop Clutch on the upper shaft and tighten the 2 set
screws.
Z Stop Clutch
Z Stop Brake
Stop Brake Belt
Adjustment
Screw
Brake Bracket
Shield Bracket
6.
Carefully clean any residue from inside the Shield Bracket with a dry,
lint-free cloth. Then Install the Shield Bracket with the 2 screws as
seen in the diagram above.
7.
Install the Z Stop Clutch cable (10PL) to P10 and the Z Stop Brake
cable (11PL) to P11 on the PCA Flex Jet Control.
8.
Install cable ties as necessary.
Final Steps
1.
Apply Loctite 222 to the 2 screws and install the Plate and Baffle
(flexible strip) on the bottom of the head. Torque the screws to 80
inch-ounces (0,56 NM).
2.
Install the FlexJet Head on the machine. Refer to the Installing a
FlexJet Head procedure located in this document.
3.
Complete the steps in the Prepare the Machine for Production section
of this document to ensure that the machine is in a safe operational
state. Verify that all covers removed for maintenance are installed,
including the safety covers below the hinged covers.
4.
Perform Calibration Placement Enhancement (CPE). Refer to the
Calibration, CPE, and Measurement manual.