FlexJet Head Assembly
T47541109 Rev. J
TECHNICAL
PUBLICATIONS
This Document Supports Assembly 47541109 Rev. F
Final Steps
1.
After all 3 belts are inspected, install the FlexJet Head cover.
2.
For a dual-beam machine, repeat from the Check the Belts section, then
proceed to the next step.
3.
After the head on a GSM1™ machine or both heads on a GSM2™
machine are inspected, install the safety cover below the hinged cover.
4.
Install any feeders removed earlier and ensure that they match the
feeder configuration in UPS.
5.
Record on the appropriate copied sheet from the Maintenance Log
document that this procedure was performed and include the date.
Verifying the Touch-Down Sensors
Verify the touch-down sensor setup for all 7 spindles using the following
procedure.
Move the Head
1.
Select
Production Control > Manual Control
.
2.
Select the correct
Operator:
option button.
3.
Select the correct beam in the
Device:
pull-down box.
The spindles must be positioned between the board-handling rails when
they are driven down to prevent damaging the head or other parts of the
machine.
4.
Select
Increment > 1.0”
.
5.
Move the head to a location between the board-handling rails by
selecting the directional buttons. Or use a maintenance location that is
between the rails.
6.
Verify that the space below the spindles is clear of PC boards or other
objects.
Lower the Spindles
1.
Select
Device > Z
.
2.
Select
Axis Locations > Display Absolute Locations
.