![UIC GSM FlexJet Скачать руководство пользователя страница 89](http://html1.mh-extra.com/html/uic/gsm-flexjet/gsm-flexjet_manual_3277471089.webp)
Page 84
T47541109 Rev. J
FlexJet Head Assembly
TECHNICAL
PUBLICATIONS
This Document Supports Assembly 47541109 Rev. F
7.
Connect the Spindle Touch-Down Sensor Assembly cable to the
appropriate location on the PCA Flex Jet Control. Refer to the
following diagram and wiring chart.
Spindle Touch-Down
Sensor Assembly 1
Z-Safe
Sensor Assemly 8
PCA Flex Jet Control
From
(Spindle Touch-Down
Sensor Assy)
To
(PC BD FlexJet Ctrl
Asm)
P18
18PL
P19
19PL
P20
20PL
P21
21PL
P22
22PL
P23
23PL
P24
24PL
P14
14PL
8.
Install the cable ties securing the Spindle Touch-Down Sensor cable to
the PCA Flex Jet Control.
Final Steps
1.
Set the Touch-Down Sensors so that the light goes off as soon as the
nozzle impacts the component or board. Refer to Setting the Touch-
Down Sensors procedure located in this document.
2.
Complete the steps in the Prepare the Machine for Production section
of this document to ensure that the machine is in a safe operational
state. Verify that all covers removed for maintenance are installed,
including the safety covers below the hinged covers and the FlexJet
Head Cover.
3.
Calibrate the spindle height. Refer to the Calibration, CPE and
Measurement manual.
4.
Perform CPE. Refer to the Calibration, CPE and Measurement
manual.