![UIC GSM FlexJet Скачать руководство пользователя страница 103](http://html1.mh-extra.com/html/uic/gsm-flexjet/gsm-flexjet_manual_3277471103.webp)
Page 98
T47541109 Rev. J
FlexJet Head Assembly
TECHNICAL
PUBLICATIONS
This Document Supports Assembly 47541109 Rev. F
6.
Install the cable ties securing the AirKiss HD Cable Assembly (17PL)
and the Vacuum HD Cable Assembly (25PL).
Final Steps
Complete the steps in the Prepare the Machine for Production section of this
document to ensure that the machine is in a safe operational state. Verify that
all covers removed for maintenance are installed, including the safety covers
below the hinged covers and the FlexJet Head Cover.
Replacing a Fiber Optic Cable
This section describes how to replace a Fiber Optic Cable due to damage or
wear. For a dual beam, the head can be removed for easier access, but
calibration time for CPE is also required.
Prerequisites
Ensure that the following items are available before beginning.
• A new Fiber Optic Cable and the special cutting device for fiber
optics
• Calibration Kit for FlexJet (for spindle-height calibration)
• CPE Kit, only if the head is removed
Initial Steps
1.
Complete the steps in the Prepare the Machine for Maintenance
section of this document to ensure that the machine is in a safe state for
maintenance.
The machine must be powered down and the site's Lockout/Tagout
procedure executed during this procedure to ensure personal safety.
2.
Remove the FlexJet Head cover. If the head is to be removed, refer to
the Removing a FlexJet Head section of this module.