![UIC GSM FlexJet Скачать руководство пользователя страница 109](http://html1.mh-extra.com/html/uic/gsm-flexjet/gsm-flexjet_manual_3277471109.webp)
Page 104
T47541109 Rev. J
FlexJet Head Assembly
TECHNICAL
PUBLICATIONS
This Document Supports Assembly 47541109 Rev. F
Replacing a FlexJet Spindle Assembly
This section describes how to replace a FlexJet Spindle Assembly due to
damage or wear. Replace a FlexJet Spindle using the following procedure.
Prerequisites
Ensure that the following items are available before beginning the procedure.
• FlexJet Tool Kit
• Torque wrench and Loctite 222
• Calibration- and CPE-Kits FlexJet
• Calibration, CPE and Measurement manual and Camera Asm, 2.6
OTH document
Initial Steps
1.
Complete the steps in the Prepare the Machine for Maintenance
section of this document to ensure that the machine is in a safe state for
maintenance. Make sure to remove the FlexJet Head Cover.
The machine must be powered down and the site's Lockout/Tagout
procedure executed during this procedure to ensure personal safety.
2.
Remove the FlexJet Head from the machine. Refer to the Removing a
FlexJet Head procedure in this document.
3.
Remove the 2.6 OTH Camera Assembly from the FlexJet Head. Refer
to Removing the OTH Camera Assembly procedure located in the
Camera Asm, 2.6 OTH document.
4.
Place the FlexJet Head assembly Spindle Assembly side up in order to
access the FlexJet Spindle Assembly.
Procedure
Perform the following steps.
Use ESD precautionary measures when handling the PCA Flex Jet
Control and associated cabling.