5-8 ENGINE REMOVAL AND INSTALLATION
• Install the return spring
7
, brake pedal
8
and master cylinder
rod pin
9
.
• Apply grease to the brake pedal pivot bolt
0
.
99000-25010: SUZUKI SUPER GREASE “A”
or equivalent
• Tighten the brake pedal pivot bolt
0
to the specified torque.
Brake pedal pivot bolt: 29 N·m (2.9 kgf-m, 21.0 lbf-ft)
• Install the clip
A
, washer
B
and cotter pin
C
.
• Install the kick starter lever
D
in the correct position.
(
8-7, -8)
• Tighten the kick starter lever bolt
E
to the specified torque.
Kick starter lever bolt: 29 N·m (2.9 kgf-m, 21.0 lbf-ft)
• Install the ignition coil/plug cap
F
securely. (
2-8)
NOTE:
The coupler of ignition coil/plug cap faces backward.
b
90°
–
110°
• Install the ignition coil retainer. (
2-8)
Replace the cotter pin
C
with a new one.
Содержание RM-Z250
Страница 1: ......
Страница 56: ...2 40 PERIODIC MAINTENANCE...
Страница 177: ...11 2 LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM CHART CAM CHAIN...
Страница 401: ...SERVICING INFORMATION 20 29 BRAKE PEDAL SET UP 1 Rear master cylinder 3 Brake pedal 2 Return spring a 0 10 0 0 4 in...
Страница 408: ...20 36 SERVICING INFORMATION FRONT FENDER INSTALLATION REAR FENDER INSTALLATION 1 Front fender 1 Seat rail 2 Rear fender...
Страница 410: ...Prepared by September 2009 Part No 99500 42190 01E Printed in Japan 420...
Страница 411: ......