SERVICING INFORMATION 20-21
CABLE ROUTING
1
Throttle cable (Pulling cable)
*2
Bind the hot starter cable and wiring harness with the
clamp.
2
Throttle cable (Returning cable)
*3 Pass the hot starter cable inside of frame bridge.
3
Hot starter cable
*4 Pass the clutch cable between radiator bracket and frame.
4
Clutch cable
*5
Pass the overflow hose and wiring harness between radia-
tor hose and frame.
5
Radiator overflow hose
*6
Pass the overflow hose between engine mounting lower
bracket.
6
Cable guide
*7
Align the matching marks on the clutch cable bracket and
on the clutch cable.
a
2 – 3 mm (0.08 – 0.12 in)
*8
Pass the throttle cable, hot starter cable and engine stop
switch lead wire inside of the cable guide.
b
14 – 16 mm (0.55 – 0.63 in)
*9
The cable guide must be positioned in parallel with the
frame head with its open end facing upward.
*1
Bind the clutch cable (White protector
position) with the clamp.
*1
*4
*9
*8
*5
*6
*7
*2
*3
Содержание RM-Z250
Страница 1: ......
Страница 56: ...2 40 PERIODIC MAINTENANCE...
Страница 177: ...11 2 LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM CHART CAM CHAIN...
Страница 401: ...SERVICING INFORMATION 20 29 BRAKE PEDAL SET UP 1 Rear master cylinder 3 Brake pedal 2 Return spring a 0 10 0 0 4 in...
Страница 408: ...20 36 SERVICING INFORMATION FRONT FENDER INSTALLATION REAR FENDER INSTALLATION 1 Front fender 1 Seat rail 2 Rear fender...
Страница 410: ...Prepared by September 2009 Part No 99500 42190 01E Printed in Japan 420...
Страница 411: ......