GEARSHIFTING 9-9
• Install the GP switch
4
and tighten the bolts
5
to the speci-
fied torque.
GP switch mounting bolt: 6.5 N·m (0.65 kgf-m, 4.7 lbf-ft)
• Install the front chain guide plate
6
and engine sprocket
cover
7
.
• Tighten the engine sprocket cover bolts
8
to specified torque.
Engine sprocket cover bolt: 11 N·m (1.1 kgf-m, 8.0 lbf-ft)
• Route the GP switch lead wire properly. (
20-20)
Содержание RM-Z250
Страница 1: ......
Страница 56: ...2 40 PERIODIC MAINTENANCE...
Страница 177: ...11 2 LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM CHART CAM CHAIN...
Страница 401: ...SERVICING INFORMATION 20 29 BRAKE PEDAL SET UP 1 Rear master cylinder 3 Brake pedal 2 Return spring a 0 10 0 0 4 in...
Страница 408: ...20 36 SERVICING INFORMATION FRONT FENDER INSTALLATION REAR FENDER INSTALLATION 1 Front fender 1 Seat rail 2 Rear fender...
Страница 410: ...Prepared by September 2009 Part No 99500 42190 01E Printed in Japan 420...
Страница 411: ......