15-16 ELECTRICAL SYSTEM
CKP SENSOR AND CRANKSHAFT ROTATION
SIGNAL SENSOR RESISTANCE
• Disconnect the magneto lead wire coupler.
• Measure the resistance between the lead wires using the
multi circuit tester. If the resistance is not within the specified
value, replace the stator with a new one.
CKP sensor resistance: 80 – 120
Ω
(Red – Green)
Crankshaft rotation signal sensor resistance:
0.1 – 0.8
Ω
(B/R – R/W)
09900-25008: Multi circuit tester set
Tester knob indication: Resistance (
Ω
)
ENGINE STOP SWITCH
• Remove the seat, radiator covers and fuel tank.
(
5-2, 13-2, -3)
• Disconnect the engine stop switch lead wire coupler
1
.
• Measure the engine stop switch resistance between B/Y lead
wire and B/W lead wire.
Engine stop switch resistance:
ON: Under 1
Ω
(B/Y – B/W)
OFF:
∞ Ω
(Infinity) (B/Y – B/W)
09900-25008: Multi circuit tester set
09900-25009: Needle-point probe set
Tester knob indication: Resistance (
Ω
)
If the measurement is out of the specification, the cause may lie
in the engine stop switch.
If the measurement is within the specification, check the continu-
ity between the engine stop switch coupler and ECM coupler.
G
R
B/R
R/W
B/Y
B/W
Normally, use the needle-point probe to the backside
of the lead wire coupler to prevent the terminal bend
and terminal alignment.
ECM coupler (Harness side)
B/W
B/Y
Содержание RM-Z250
Страница 1: ......
Страница 56: ...2 40 PERIODIC MAINTENANCE...
Страница 177: ...11 2 LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM CHART CAM CHAIN...
Страница 401: ...SERVICING INFORMATION 20 29 BRAKE PEDAL SET UP 1 Rear master cylinder 3 Brake pedal 2 Return spring a 0 10 0 0 4 in...
Страница 408: ...20 36 SERVICING INFORMATION FRONT FENDER INSTALLATION REAR FENDER INSTALLATION 1 Front fender 1 Seat rail 2 Rear fender...
Страница 410: ...Prepared by September 2009 Part No 99500 42190 01E Printed in Japan 420...
Страница 411: ......