PERIODIC MAINTENANCE 2-17
OIL STRAINER (No.2) INSTALLATION
• Install the oil strainer No.2
1
and tighten the oil strainer No.2
bolts
2
to the specified torque.
Oil strainer No.2 bolt: 5.5 N·m (0.55 kgf-m, 4.0 lbf-ft)
• Install the oil pump No.2 cover
3
and tighten the oil pump
No.2 bolts
4
to the specified torque.
Oil pump No.2 bolt: 11 N·m (1.1 kgf-m, 8.0 lbf-ft)
• Install the magneto cover. (
15-19)
• Install the gearshift lever. (
9-7)
INSPECTION AFTER INSTALLATION
• Engine oil level and oil leakage (
2-12)
OIL STRAINER (No.1) INSTALLATION
• Install the oil strainer and then tighten the engine oil strainer
cap
1
to the specified torque.
Engine oil strainer cap: 21 N·m (2.1 kgf-m, 15.0 lbf-ft)
• Add new engine oil and check the oil level. (
2-12)
Replace the gasket washer with a new one.
Содержание RM-Z250
Страница 1: ......
Страница 56: ...2 40 PERIODIC MAINTENANCE...
Страница 177: ...11 2 LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM CHART CAM CHAIN...
Страница 401: ...SERVICING INFORMATION 20 29 BRAKE PEDAL SET UP 1 Rear master cylinder 3 Brake pedal 2 Return spring a 0 10 0 0 4 in...
Страница 408: ...20 36 SERVICING INFORMATION FRONT FENDER INSTALLATION REAR FENDER INSTALLATION 1 Front fender 1 Seat rail 2 Rear fender...
Страница 410: ...Prepared by September 2009 Part No 99500 42190 01E Printed in Japan 420...
Страница 411: ......