6-6 CYLINDER HEAD, CYLINDER AND PISTON
• Disengage the camshafts
C
from cam chain
B
.
• Remove the dowel pins
D
and C-rings
E
.
CYLINDER HEAD REMOVAL
• Remove the camshafts. (
6-4, -5)
• Remove the spark plug. (
2-7)
• Remove the throttle body. (
13-8, -9)
• Drain engine coolant. (
14-3)
• Loosen the muffler connector clamp bolt
1
.
• Remove the exhaust pipe
3
by removing their nuts
2
.
• Remove the exhaust pipe gasket
4
• Disconnect the radiator hoses
6
by loosing their clamp
screws
5
.
• Disconnect the ECT sensor coupler
7
.
• Remove the engine mounting upper brackets
9
by removing
their bolts and nut
8
.
• Remove the TO sensor
0
.
• Remove the left radiator louver
A
.
• Remove the left radiator mounting bolts
B
.
Do not drop the cam chain
B
, dowel pins
D
and C-
rings
E
into the crankcase.
Содержание RM-Z250
Страница 1: ......
Страница 56: ...2 40 PERIODIC MAINTENANCE...
Страница 177: ...11 2 LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM CHART CAM CHAIN...
Страница 401: ...SERVICING INFORMATION 20 29 BRAKE PEDAL SET UP 1 Rear master cylinder 3 Brake pedal 2 Return spring a 0 10 0 0 4 in...
Страница 408: ...20 36 SERVICING INFORMATION FRONT FENDER INSTALLATION REAR FENDER INSTALLATION 1 Front fender 1 Seat rail 2 Rear fender...
Страница 410: ...Prepared by September 2009 Part No 99500 42190 01E Printed in Japan 420...
Страница 411: ......