EUD-2016026-00 Rev.2, SmartScanIS User’s Guide for Union Pacific, 14 January 2021
85
2
Lower one metal mast base into each hole, rotating it until one edge of the base is
parallel to the track.
Install each base so that it's plumb and so that its center is 11 feet (3.3 meters) from
the center of the track and 25 inches (0.6 meters) from the center of the crib in which
the bearing scanner will be installed. Both bases will be north or east of the crib.
3
With the supplied hardware, attach one mast to each base.
4
Plumb each mast.
5
Ground each mast.
When done, each mast should be level, grounded, attached to a base, and placed
directly opposite the other mast.
5.4 Preparing the Bungalow
To ready the bungalow:
1
Place the bungalow on level, well-drained ground.
Face the door side of the bungalow toward the tracks. This side of the bungalow
should be parallel to the track and 15 feet (4.6 meters) from the center of the track.
2
Level the bungalow.
Содержание SmartScanIS
Страница 1: ...EUD 2016026 00 Rev 2 SmartScanIS User s Guide for Union Pacific 14 January 2021...
Страница 82: ...82 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Страница 90: ...90 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Страница 130: ...130 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Страница 258: ...258 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Страница 376: ...376 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Страница 380: ...380 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...