84
14 January 2021, SmartScanIS User’s Guide for Union Pacific, EUD-2016026-00 Rev.2
7
Mark the rail at the midpoint between the ties.
If you are going to install antenna masts, in addition to identifying where the bearing
scanners will be installed, this midpoint mark will also be used later to locate where the
holes for the mast bases are to be dug.
8
If your installation has wheel scanners:
a
Select a location to install them.
The wheel scanners should be centered in the crib of the two ties immediately
ahead (and to the north or east) of the bearing scanners.
b
Repeat steps
2
through
6
.
5.3 Preparing the AEI Antenna Masts
If your
single-track site
uses AEI equipment, to ready the two antenna masts (aka poles):
1
Using the dimensions below, dig two holes and add ballast.
Содержание SmartScanIS
Страница 1: ...EUD 2016026 00 Rev 2 SmartScanIS User s Guide for Union Pacific 14 January 2021...
Страница 82: ...82 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Страница 90: ...90 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Страница 130: ...130 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Страница 258: ...258 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Страница 376: ...376 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Страница 380: ...380 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...