EUD-2016026-00 Rev.2, SmartScanIS User’s Guide for Union Pacific, 14 January 2021
155
10
On the Surge Protection Subassembly, toggle on both breakers.
11
Observe the bank of status LEDs on the System Interface board.
On or before 10 seconds, LEDs 5 and 20 should begin to fade slowly off and on.
12
After 10 seconds, if LEDs 5 and 20 aren't fading off and on, call STC for help in
isolating and fixing the underlining problem.
13
Close the door on the SmartScanIS enclosure.
1
16
15
20
19
18
17
10
2
14
9
5
4
3
8
7
6
11
12
13
21
22
lights when
processor-A
is operating properly
lights when
processor-B
is operating properly
1
16
15
20
19
18
17
10
2
14
9
5
4
3
8
7
6
11
12
13
21
22
1
16
15
20
19
18
17
10
2
14
9
5
4
3
8
7
6
11
12
13
21
21
22
22
lights when
processor-A
is operating properly
lights when
processor-B
is operating properly
Содержание SmartScanIS
Страница 1: ...EUD 2016026 00 Rev 2 SmartScanIS User s Guide for Union Pacific 14 January 2021...
Страница 82: ...82 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Страница 90: ...90 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Страница 130: ...130 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Страница 258: ...258 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Страница 376: ...376 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...
Страница 380: ...380 14 January 2021 SmartScanIS User s Guide for Union Pacific EUD 2016026 00 Rev 2...