7-14
DVW-250/250P
7-2-5. S1 Guide Slantness Adjustment
Tools
• Alignment tape ZR2-1
8-960-073-11
• Alignment tape ZR2-1P
8-960-073-61
• Torque screwdriver (for 3 kg)
J-6325-400-A
• Torque screwdriver’s hex. bit (across 1.27 mm)
J-7031-460-A
• Oscilloscope
• Regulated DC power supply
(AC-550/550CE or equivalent)
Setting
1.
Turn the power off.
2.
Remove the top panel.
(Refer to “1-5. Removal/Installation of Cabinet”.)
3.
Remove the battery case.
(Refer to “1-5. Removal/Installation of Cabinet”.)
4.
Connect an oscilloscope.
CH-1 : TP10/MB-601 (REC A)
TRIG : TP8/MB-601 (CF)
5.
Connect a regulated DC power supply to DC IN
connector on the connector panel.
6.
Set all four switches of DIP switches S1 and S2 on the
UDR-9 board which attaches to the upper drum to ON.
7.
Set switch S700-1 on the EQ-54 board to ON.
8.
Turn the power on.
9.
On the setup menu, set AUTO TRACKING to OFF.
10. Insert an alignment tape ZR2-1/1P.
Adjustments
1. Playback the alignment tape.
Play back the alignment tape ZR2-1/1P (from 00:00 to
15:00).
7-2-5. S1 Guide Slantness Adjustment