![background image](http://html1.mh-extra.com/html/safco/cs-i-150a/cs-i-150a_operation-and-maintenance_3253595014.webp)
3.
CS
Safc
tel. +
2.4.
No
CS
Ma
The
The
Installat
3.1.
Co
3.1.1
Po
The
the
The
it is
ma
PE
gro
Sel
cau
Tig
the
Ens
-I User and
co Systems Ltd-
+39 024504433
otes on ins
-I is design
x 80% non-
e operating
e unit shoul
tion and
onnecting
ower sup
e operation
e main pow
e operation
s recomme
ake sure the
cable sect
ound syste
lect the ap
use overhe
ghten the c
e clamps co
sure no fra
d Maintenan
-Via Isonzo 17/b
Fax +39 02450
stallation
ned for pane
-condensing
room temp
d not be mo
connect
the CS-I /
pply sect
ns of conne
wer line not
n of connec
ended there
e ground te
tion equal
em .
propriate s
eating and
ables with
ompromisi
aying or lea
nce, R.2.8 EN
b-20090 Cesano
04321 E-mail:inf
el amountin
g) and prote
perature mu
ounted in co
tors
P
ion
ection to th
t connected
ction to po
efore be tre
erminal is
to that of p
section of p
rupture, w
an adequa
ng the effic
akage from
NG
o Boscone-Mila
ng, for oper
ected from
st be within
ontact with
CAUT
he power s
d.
ower line in
eated very
properly co
power, and
power cabl
ith serious
ate and con
ciency.
m the cables
n-Italy
Web site: www
ration in a d
dust and liq
n the range
parts subje
TION
supply mus
nvolves risk
carefully i
onnected t
d that the p
les: the ina
s conseque
ntrolled tor
s terminals
.safcosys.it
dry environm
quids.
0 / 50 º C.
ct to severe
st always b
ks and dan
n the cours
to the term
lant is equ
appropriate
ences.
rque avoidi
s, before po
ment (relati
e vibration.
be carried o
ngers not e
se of this o
minal design
ipped with
e use of ca
ing the de
owering th
14 of 109
ve humidity
out with
eliminable,
operation:
nated as
h efficient
bles can
eforming
he system.
9
y