![background image](http://html1.mh-extra.com/html/safco/cs-i-150a/cs-i-150a_operation-and-maintenance_3253595106.webp)
CS-I User and Maintenance, R.2.8 ENG
Safco Systems Ltd-Via Isonzo 17/b-20090 Cesano Boscone-Milan-Italy
tel. +39 024504433 Fax +39 024504321 E-mail:[email protected] Web site: www.safcosys.it
106 of 109
14.7.
Spot cycle timing diagram (Annex F)
CUR
R DOW
N
SLO
P
E
*= At the call of the program is set to the first pressure from P1-2-3-4-5, not set to 0, so if its time is not 0,
set for pressures of 0 is maintaining the pressure above.
In repeated cycles with the pre-Squeeze first jump is set at the end of maintenance, the first pressure is
not between 0 to P1-2-3-4-5, this is also valid in case of non-repeating cycle.
By setting the cycle repeated after pre-jump Squeeze is set at the end of maintenance, the first pressure
between P2-3-4-5 is not set to 0
The exchange of the pressure from phase to phase takes place in the previous half period exchange with
a time of adjustment of the voltage of 5ms.