Command Reference
R&S
®
ZNB/ZNBT
874
User Manual 1173.9163.02 ─ 38
CONTrol<Ch>:SEQuence<Nr>:GPIO<Port>:VOLTage
<Voltage>
For unsegmented sweeps this command allows to define the GPIO voltage settings to
be applied at the start of each sweep.
The GPIO ports can be enabled/disabled using
. Complementary RFFE commands can be defined using
SEQuence<Nr>:RFFE<Bus>:COMMand:DATA
.
Suffix:
<Ch>
.
Channel number
<Nr>
Sequence number, defining the order in which the switches/
commands shall be executed.
For every channel and GPIO port, the sequence numbers must
be consecutive, starting at 1; reusing a sequence number over-
writes a previous voltage setting.
Delays between subsequent settings/command and - finally - the
start of the respective sweep segment can be introduced using
CONTrol<Ch>:SEQuence<Nr>:DELay
<Port>
GPIO port number
Parameters:
<Voltage>
Range:
-6 to +12 V
Increment: 0.005 V
Default unit: V
Manual operation:
See
"GPIO columns (sweep sequencer table)"
CONTrol<Ch>:SEQuence<Nr>:RFFE<Bus>:COMMand:DATA
<Command>
For unsegmented sweeps this command allows to define the RFFE command(s) to be
executed at the start of each sweep.
Command execution on an RFFE interface can be enabled/disabled using
CONTrol<Ch>:RFFE<Bus>:SETTings[:STATe]
. Complementary GPIO switches
can be defined using
CONTrol<Ch>:SEQuence<Nr>:GPIO<Port>:VOLTage
Suffix:
<Ch>
.
Channel number
<Nr>
Sequence number, defining the order in which the commands
shall be executed.
For every channel and RFFE interface, the sequence numbers
must be consecutive, starting at 1; reusing a sequence number
overwrites a previously defined command.
Delays between subsequent commands and - finally - the start
of the respective sweep can be introduced using
CONTrol<Ch>:SEQuence<Nr>:DELay
<Bus>
RFFE bus interface number
SCPI Command Reference