GUI Reference
R&S
®
ZNB/ZNBT
265
User Manual 1173.9163.02 ─ 38
Figure 5-5: Calibration Unit wizard, step 2: Connections (>4 test ports and multiple port assignments)
Port Assignment (manual)
The "Connections" step allows to configure the assignment(s) between VNA ports and
calibration unit ports manually.
The R&S
ZNB/ZNBT always proposes an optimum solution (minimum number of
assignments) that additionally minimizes the physical port reconnections required
between calibration stages. For user-modified assignments it provides assistive infor-
mation indicating insufficient, or redundant entries.
The test port connectors are automatically set according to the connector type of the
selected calibration unit port.
Remote command:
[SENSe<Ch>:]CORRection:COLLect:AUTO:ASSignment<Asg>:DEFine
[SENSe<Ch>:]CORRection:COLLect:AUTO:ASSignment<Asg>:DEFine:TPORt
[SENSe<Ch>:]CORRection:COLLect:AUTO:ASSignment:COUNt?
Detect Port Assignment
Starts a procedure by which the R&S
ZNB/ZNBT (with a little help from the attached
calibration unit) auto-detects the connected ports. The automatic assignment replaces
the configured one.
In case auto-detection fails
●
an error report is shown as a warning dialog
●
the undetected port connections are overlayed by warning signs
●
the calibration may be invalid
Cal Softtool