9924880 Rev 2- 1/10/2014 - 2013 / 2014 RANGER XP 900 - 2014 RANGER XP 900 / CREW 900 Service Manual
© Copyright Polaris Sales Inc.
8.27
16. Torque the locking screw to specification.
TORQUE
Snorkel Locking Screw:
8-10 ft-lbs (11-14 Nm)
Transmission Assembly
NOTE
The snorkel shaft and pinion shaft must be installed
prior to transmission assembly. The snorkel shaft
cannot be installed after assembling the transmission.
17. Clean both transmission case halves thoroughly.
Inspect case half mating surfaces for damage.
18. Install
shift
fork
(S)
and
torsion
spring
into
transmission housing as an assembly. Load spring
as shown in image below
19. Apply Loctite® 242 to (2) screws (T) and install with
retaining
plates
over
shift
fork.
Torque
to
specification.
TORQUE
Shift Fork Screws:
7-10 ft-lbs (10-14 Nm)
20. Slide engagement dog (U) onto retaining pins of shift
fork.
21. Assemble the reverse shaft assembly and input shaft
assembly
if
previously
disassembled
(see
illustrations).
Содержание RANGER CREW 900 2014
Страница 430: ...2013 RANGER XP 900 NON EPS...
Страница 431: ...2013 RANGER XP 900 NON EPS...
Страница 432: ...2013 RANGER XP 900 EPS...
Страница 433: ...2013 RANGER XP 900 EPS...
Страница 434: ...2013 RANGER XP 900 CARGO BOX...
Страница 435: ......
Страница 436: ......
Страница 437: ......
Страница 438: ......
Страница 439: ......
Страница 440: ......
Страница 441: ......
Страница 442: ......