Ending operation
206
Folding the crane
Extend the extension booms about 50 cm (20").
Fold the outer boom completely.
Retract the hydraulic extension booms The
suspension eye on the first extension boom
must be above the catch.
Unfold the outer boom.
Slew the crane until the folding arrow on the
base and the mark on the crane column and
are aligned (set-down position) .
Lower the main boom. The boom system rests
in the intended support on the base.
For cranes with fly-jib system refer to the fly-jib operating instructions.
For cranes with rope winch see 'Rope winch’ in chapter 6, ‘Ancillary equipment’.
Resting the boom on the vehicle platform or boom support
Danger!
If the boom system is not secured against any side movements this
creates an acute danger to life of all road users.
Not knowing the vehicle's total height and not observing the clearance
heights creates an acute risk of fatal injury.
Содержание PK 34002-SH P7
Страница 1: ......
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 12: ......
Страница 14: ......
Страница 24: ......
Страница 26: ......
Страница 30: ......
Страница 57: ...Chapter 4 Device and function 51 Grab Open Close Close Open Open Close Close Open Open Close Close Open...
Страница 66: ...Device and function 60 Overview of labels...
Страница 76: ......
Страница 78: ......
Страница 128: ......
Страница 158: ......
Страница 182: ......
Страница 184: ......
Страница 208: ......
Страница 210: ......
Страница 222: ......
Страница 224: ......
Страница 242: ......
Страница 252: ......
Страница 254: ......
Страница 258: ......
Страница 259: ...Chapter 13 253 C H A P T E R 1 3 Technical description...
Страница 260: ...254...