Ancillary equipment
130
1 Move the load arm into working position (see ‘Move the load arm to a working position’ in chapter
‘Preparing for crane operation’):
A
x
Move the outer boom in vertical position.
x
Push the extension booms out to distance A (until approx.
50 cm (2 ft) before the pulley head).
2 Assembling the pulley head:
Note!
For the pulley head load capacity refer to ‘Technical data’.
A
B
C
x
Fasten and lock the connecting block (A) in the extension
boom using pins.
x
Actuate ‘Extend extension boom’ until the connecting
block can be attached to the pulley head (B).
x
Fasten and lock the pulley head and connecting block
with pin (B).
x
Rotate the pulley head upwards, until it is possible to
fasten and lock it in the load lug (C).
Содержание PK 34002-SH P7
Страница 1: ......
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 12: ......
Страница 14: ......
Страница 24: ......
Страница 26: ......
Страница 30: ......
Страница 57: ...Chapter 4 Device and function 51 Grab Open Close Close Open Open Close Close Open Open Close Close Open...
Страница 66: ...Device and function 60 Overview of labels...
Страница 76: ......
Страница 78: ......
Страница 128: ......
Страница 158: ......
Страница 182: ......
Страница 184: ......
Страница 208: ......
Страница 210: ......
Страница 222: ......
Страница 224: ......
Страница 242: ......
Страница 252: ......
Страница 254: ......
Страница 258: ......
Страница 259: ...Chapter 13 253 C H A P T E R 1 3 Technical description...
Страница 260: ...254...