Chapter 7 Preparing for crane operation
175
Daily function check of safety equipment
Carry out the function check without load and with all extension booms retracted.
Emergency cut-off function check
Danger!
If the crane doesn’t stop after pressing the emergency cut-off button
or if other crane movements are still possible there is acute danger to
life.
Working with a defective emergency cut-off button is grossly negligent. Do not operate the crane and
contact a PALFINGER service partner.
x
Operate any crane function. The crane must move perfectly in all directions.
x
Press the emergency cut-off button while the crane is moving. The crane must come to a stop.
Whenever the emergency cut-off button is pushed, it snaps into the OFF position.
x
Again, operate any crane function.
The crane must not move.
Resuming work with the crane:
x
The reason for pressing the emergency cut-off switch (danger situation) must have been resolved.
x
Release the emergency cut-off button;
In case of remote operation the remote control console can now be restarted.
x
The crane should move perfectly in all directions.
Note!
The emergency cut-off button on the remote control console switches
off the remote control handset.
Содержание PK 34002-SH P7
Страница 1: ......
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 12: ......
Страница 14: ......
Страница 24: ......
Страница 26: ......
Страница 30: ......
Страница 57: ...Chapter 4 Device and function 51 Grab Open Close Close Open Open Close Close Open Open Close Close Open...
Страница 66: ...Device and function 60 Overview of labels...
Страница 76: ......
Страница 78: ......
Страница 128: ......
Страница 158: ......
Страница 182: ......
Страница 184: ......
Страница 208: ......
Страница 210: ......
Страница 222: ......
Страница 224: ......
Страница 242: ......
Страница 252: ......
Страница 254: ......
Страница 258: ......
Страница 259: ...Chapter 13 253 C H A P T E R 1 3 Technical description...
Страница 260: ...254...