Chapter 5 Safety equipment
101
Geometry monitoring
Danger!
At a boom position higher than 60°
x
abrupt crane movements
may lead to an excessive side or rear loading of the boom system.
Consequently the load may fall down. This creates an acute risk of
fatality for the operator and others.
If the crane is delivered with CE conformity, it is equipped with geometry monitoring system depending
on the extensions installed.
The geometry monitoring system provides load-dependent and load-independent control of the boom
system.
It measures the total of all boom angles (of crane and fly-jib, if installed).
It is indicated on the Paltronic 150 display unit at the crane and/or the remote control handset whether
the geometry monitoring was triggered with the crane or the fly-jib (see also ‘Display menu navigation’
in 'Paltronic 150 control system', chapter 5).
Load-independent geometry monitoring (crane boom angle = max. 85°)
All crane movements that increase the outer boom angle are blocked at an outer boom angle of max.
85°, irrespective of the load that has been lifted.
Crane examples:
Содержание PK 34002-SH P7
Страница 1: ......
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 12: ......
Страница 14: ......
Страница 24: ......
Страница 26: ......
Страница 30: ......
Страница 57: ...Chapter 4 Device and function 51 Grab Open Close Close Open Open Close Close Open Open Close Close Open...
Страница 66: ...Device and function 60 Overview of labels...
Страница 76: ......
Страница 78: ......
Страница 128: ......
Страница 158: ......
Страница 182: ......
Страница 184: ......
Страница 208: ......
Страница 210: ......
Страница 222: ......
Страница 224: ......
Страница 242: ......
Страница 252: ......
Страница 254: ......
Страница 258: ......
Страница 259: ...Chapter 13 253 C H A P T E R 1 3 Technical description...
Страница 260: ...254...