Chapter 6 Ancillary equipment
129
Preparing rope winch operation
Note!
Depending on your model observe the sections ‘RTC (rope tension
control)’ and ‘SRC Synchronous rope winch control’ in chapter
‘Safety equipment’ regarding the assembly procedure!
Danger!
When you don’t turn off the crane between the assembly steps, crane
functions may be actuated unintendedly. This poses risk of injury and
severe risk of fatality for the operator and others.
Turn off the crane power between two assembly steps, where crane
movement is not required.
Danger!
Failure to maintain the required minimum distances poses risk of
getting crushed and hence injured and represents an acute risk of
fatality.
During all work steps you must keep the
required minimum distances to all crushing
points (refer 'Danger of getting crushed' in
‘Safety and Health Standards’).
Содержание PK 34002-SH P7
Страница 1: ......
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 12: ......
Страница 14: ......
Страница 24: ......
Страница 26: ......
Страница 30: ......
Страница 57: ...Chapter 4 Device and function 51 Grab Open Close Close Open Open Close Close Open Open Close Close Open...
Страница 66: ...Device and function 60 Overview of labels...
Страница 76: ......
Страница 78: ......
Страница 128: ......
Страница 158: ......
Страница 182: ......
Страница 184: ......
Страница 208: ......
Страница 210: ......
Страница 222: ......
Страница 224: ......
Страница 242: ......
Страница 252: ......
Страница 254: ......
Страница 258: ......
Страница 259: ...Chapter 13 253 C H A P T E R 1 3 Technical description...
Страница 260: ...254...