Preparing for crane operation
174
Unfolding the crane
Danger!
There is acute danger to life for operators and others, and device and
auxiliary components may get damaged if the steps are not carried out
in the given order.
Always carry out the steps in the correct order.
Move the main boom to a
near-vertical position.
Fold the outer boom
completely.
Move extension boom out of
suspension eye.
Unfold the outer boom.
x
The crane is ready for operation.
For cranes with fly-jib system refer to the fly-jib operating instructions.
For attachment of ancillary equipment (rope winch, grab, etc.) see chapter 6.
Содержание PK 34002-SH P7
Страница 1: ......
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 12: ......
Страница 14: ......
Страница 24: ......
Страница 26: ......
Страница 30: ......
Страница 57: ...Chapter 4 Device and function 51 Grab Open Close Close Open Open Close Close Open Open Close Close Open...
Страница 66: ...Device and function 60 Overview of labels...
Страница 76: ......
Страница 78: ......
Страница 128: ......
Страница 158: ......
Страница 182: ......
Страница 184: ......
Страница 208: ......
Страница 210: ......
Страница 222: ......
Страница 224: ......
Страница 242: ......
Страница 252: ......
Страница 254: ......
Страница 258: ......
Страница 259: ...Chapter 13 253 C H A P T E R 1 3 Technical description...
Страница 260: ...254...