Installation of the SK 200E
In order to carry out the electrical connection of the SK 200E, this may need to be removed from the
connection unit. To do this, remove the 4 fastening screws, so that the frequency inverter can be lifted off
vertically.
After the electrical connection of the power cables has been made, the frequency inverter can be replaced.
This must be carried out in a vertical direction relative to the connection unit without tilting. The PE cinch
plug can be used in order to ensure correct guidance.
In order to achieve the maximum protection class
IP55/IP66, care must be taken that all frequency
inverter fixing screws are gradually tightened
diametrically oppositely, with the torques stated in
the table below.
For the cable gland of the connecting cable,
appropriate screwed connections for cable cross-
section must be used.
Dissipation of heat generated by the inverter occurs
by means of convection. This is assisted by the
airflow of the motor. Because of this, a reduction in
power for unventilated motors or wall-mounted
devices must be taken into account (for further
details see Section 7, Technical Data).
Heat dissipation must not be hindered by severe
contamination.
Frequency inverter size
Screw size
Tightening torque
Size I
M5 x 45
3.5Nm ± 20%
Size II
M5 x 45
3.5Nm ± 20%
Size III
M5 x 45
3.5Nm ± 20%
Cinch plug
Содержание NORDAC SK 200E
Страница 2: ...NORDAC SK 200E Manual 2 BU 0200 GB...
Страница 35: ...2 Mounting and Installation BU 0200 GB Subject to technical alterations 35...
Страница 60: ...NORDAC SK 200E Manual 60 Subject to technical alterations BU 0200 GB...
Страница 151: ...5 9 Overview of Parameters User defined Settings BU 0200 GB Subject to technical alterations 151...