F-20 PREPARATION BEFORE STARTING MASS PRODUCTION
7)
Display the WORK OFFSET screen.
8)
Move the cursor to "COMMON Z1" using the cursor
control keys.
9)
Set the Z-axis shift amount of 100 mm.
Input "
100.0" using the data entry keys.
1.
To input the Z-axis shift amount for spindle
2, press the following keys in order (S type):
2.
Make sure the sign for the entered value is
correct.
10)
Press the
[(+) INPUT]
soft-key.
If the
(INPUT) key is pressed, the value
having been input with data entry keys is input for
the work shift offset data (Z-axis). Therefore,
make sure to press the
[(+) INPUT]
soft-key.
11)
Press the single block switch
to make the
single block function valid.
For items 12) and 13) below, determine whether
or not the corresponding function should be used.
12)
Press the optional stop switch
to make the
optional stop function valid.
13)
Press the dry run switch
to make the dry run
function valid.
14)
Make sure that the rapid traverse rate override,
feedrate override and spindle speed override is set
correctly.
CAPS
CAPS
J
W
U
R
Q
P
)
N
O
(
SP
F
&
K
]
[
I
L
S
=
#
M
V
@
H
?
Y
D
\
G
E
*
T
B
C
Z
X
7
8
2
4
5
1
A
+
0
;
:
EOB
.
RESET
DELETE
SETTING
OFFSET
POS
SYSTEM
PROG
MESSAGE
NETWORK
INSERT
INPUT
ALTER
HELP
SHIFT
.
9
3
6
CAN
0
0
0
1
.
NOTE
0
0
0
1
.
GEOM.
WEAR
SET UP
(+)
INPUT
MEASURE
WORK
1
F
10
F
2
F
3
F
4
F
5
F
6
F
7
F
8
F
9
F
NOTE
INPUT
SBK
OSP
BDT
DRN
PST
PSM
FUNCTION
NOTE