75
CHAPTER 6 INSTALLATION AND WIRING
6
6.
4
T
e
st
s Af
te
r W
iring
6.
4.
1
Loop t
es
t
Remark
The test status and result can be viewed through monitoring the link special relays (SBs) on GX Works2.
Item
Description
When completed
• Loop test completion status (SB0094): ON
• Loop test normal/abnormal end (SB0095): OFF
When failed
• Loop test completion status (SB0094): ON
• Loop test normal/abnormal end (SB0095): ON
Содержание QJ71GF11-T2
Страница 1: ...MELSEC Q CC Link IE Field Network Master Local Module User s Manual QJ71GF11 T2 ...
Страница 2: ......
Страница 558: ...556 Appendix 12External Dimension Diagram 27 4 23 115 98 4 Unit mm ...
Страница 559: ...557 APPENDICES A Appendix 12 External Dimension Diagram Memo ...
Страница 567: ......