![Mitsubishi Electric QJ71GF11-T2 Скачать руководство пользователя страница 167](http://html.mh-extra.com/html/mitsubishi-electric/qj71gf11-t2/qj71gf11-t2_user-manual_1811847167.webp)
165
CHAPTER 8 FUNCTIONS
8
8.
3
IP
Pac
ket
T
ransf
e
r F
u
n
cti
on
8.
3.
7
Ex
ample of
com
m
unicat
ions using
the I
P
pac
ket
t
ransf
e
r
funct
ion
3.
Set the routing parameters in the CPU module 2.
Project window
[Parameter]
[Network Parameter]
[Ethernet/CC IE/MELSECNET]
button
4.
The local station (station number 2) does not require an IP address.
The network address set in the master station (station number 0) is automatically assigned.
5.
Write the set parameters to the CPU module 2. Then reset the CPU module 2 or power off and on
the system.
[Online]
[Write to PLC]
(c) Checking the status of communications
After the setting is completed in each module, execute the IP communication test to check for an error in the
communication route on CC-Link IE Field Network. (
• When the IP communication test is normally completed
The following window appears.
• When the IP communication test ends abnormally
If the test ends abnormally, click the
button in "Error Information" to check the error information.
If IP communications cannot be performed due to a timeout error or other reasons, refer to "IP
communications cannot be performed using the IP packet transfer function" in this manual and take
corrective actions. (
or Power OFF ON
RESET
Содержание QJ71GF11-T2
Страница 1: ...MELSEC Q CC Link IE Field Network Master Local Module User s Manual QJ71GF11 T2 ...
Страница 2: ......
Страница 558: ...556 Appendix 12External Dimension Diagram 27 4 23 115 98 4 Unit mm ...
Страница 559: ...557 APPENDICES A Appendix 12 External Dimension Diagram Memo ...
Страница 567: ......