![Mitsubishi Electric QJ71GF11-T2 Скачать руководство пользователя страница 314](http://html.mh-extra.com/html/mitsubishi-electric/qj71gf11-t2/qj71gf11-t2_user-manual_1811847314.webp)
312
(2) Function
(a) REQ instruction overview
The instruction sends request data (S2) to the target station for requesting service.
Specify the target stations in control data ((S1)+4 and (S1)+5).
When the request to the target station is completed, the completion device (D2) turns on.
(b) Target stations that can be specified
For details on target stations which can be specified, refer to the following.
(c) Checking the execution status of the REQ instruction
The execution status (completion or error) of the REQ instruction can be checked using the following devices
specified in the setting data.
• Completion device (D2)
This device turns on in the END process of the scan where the REQ instruction is completed and turns off
in the next END process.
• Completion status indication device ((D2)+1)
If the REQ instruction fails, this device turns on in the END process of the scan where the REQ instruction
is completed and turns off in the next END process.
RUN/STOP
Master/local module
CPU module
CPU module
REQ
Network module
(S2)
Channel 1
Channel 2
[Own station]
[Target station]
Содержание QJ71GF11-T2
Страница 1: ...MELSEC Q CC Link IE Field Network Master Local Module User s Manual QJ71GF11 T2 ...
Страница 2: ......
Страница 558: ...556 Appendix 12External Dimension Diagram 27 4 23 115 98 4 Unit mm ...
Страница 559: ...557 APPENDICES A Appendix 12 External Dimension Diagram Memo ...
Страница 567: ......