Janu
ary 201
9
Legrand PDU User Guide 103
Field
Function
Note
Name
Customizes the device name.
*Outlet state on
device startup
Determines the initial power state of
ALL outlets after the Legrand PDU
powers up.
Options: on, off, and last known
See
Options for Outlet State on
Startup
(on page 104).
After removing power from the
PDU, you must wait for a minimum
of 10 seconds before powering it
up again. Otherwise, the default
outlet state settings may not work
properly.
You can override the global outlet
state setting on a per-outlet basis
so specific outlets behave
differently on startup. See
Individual Outlet Pages
(on page
114).
*Outlet
initialization delay
on device startup
Determines how long the Legrand
PDU waits before providing power to
all outlets during power cycling or
after recovering from a temporary
power loss.
Range: 1 second to 1 hour
See
Initialization Delay Use Cases
(on page 104).
*Power off period
during power cycle
Determines the power-off period after
the outlet is switched OFF during a
power cycle.
Range: 1 second to 1 hour
Power cycling the outlet(s) turns
the outlet(s) off and then back on.
You can override this global power
cycle setting on a per-outlet basis
so specific outlets' power-off
period is different. See
Individual
Outlet Pages
(on page 114).
*Inrush guard
delay
Prevents a circuit breaker trip due to
inrush current when many devices
connected to the PDU are turned on.
Range: 100 milliseconds to 10
seconds
See
Inrush Current and Inrush
Guard Delay
(on page 104).
3. Click
Save.
To reset ALL active energy counters:
An active energy reading is a value of total accumulated energy, which is never reset, even if the power fails
or the Legrand PDU is rebooted. However, you can manually reset this reading to restart the energy
accumulation process.
Only users with the "Admin" role assigned can reset active energy readings.
Note: This reset button does not reset the active energy values of outlet groups. See
Outlet Groups
(on
page 117).
1. Click
.
2. Click Reset on the confirmation message.
All active energy readings on this Legrand PDU are reset to zero.
Содержание 1U
Страница 1: ...Legrand PDU User Guide Xerus Firmware v3 5 0 ...
Страница 2: ...Copyright 2019 Legrand Inc LG 0B v3 5 0 E January 2019 255 80 0054 00 ...
Страница 53: ...January 2019 Legrand PDU User Guide 53 ...
Страница 77: ...January 2019 Legrand PDU User Guide 77 4 Press to show the Network Cascading page ...