261
9
Faults
No.
Description
D1
D2
Extra
245
Fuel valves are OPEN in spite of malfunction.
The fuel valves are open although a fault is pending.
– Reset fault
– If the fault still exists:
Send fault number and diagnostic code to the
technical support.
– Replace the device
Internal
information
0
R = 0
Power ON Reset
246
No fault shut-down of the FAT although a fault is
pending.
– Reset fault
– If the fault still exists:
Send fault number and diagnostic code to the
technical support.
– Replace the device
Internal
information
0
R = 0
Power ON Reset
247
Pilot air pressure is missing.
No air pressure for the pilot burner.
– Check air pressure switch
– Check fan
Internal
Information
0
R = 0, 0, 0, 0
Reset
248
Valve leakage test: Gas pressure is still present.
Main valve 1 is leaking
– Check gas pressure switch for function
– Is main valve 2 opened during the test?
No: check the valve, replace if necessary
check
wiring
– Check output pressure at the main valves during
the venting of the test line.
If the outlet pressure is higher than the adjusted gas
pressure at the pressure switch, take the following
measures:
– Re-adjust the pressure switch and recalculate the
detected leakage rate (observe local standards
and guidelines).
– Reduce the aperture of the air damper for venting
– If the fault still exist: change main valve 1
Internal
Information
Fuel train
R = 0, 0, 0, 0
Reset
249
Valve leakage check: Gas pressure is still present.
Main valve 2 is leaking
– Check gas pressure switch for function
– Is main valve 1 opened during the test?
No: check the valve, replace if necessary
check
wiring
– Check output pressure at the main valves
during the venting of the test line.
If the outlet pressure is higher than the
adjusted gas pressure at the pressure switch,
take the following measures:
– Re-adjust the pressure switch and recalculate
the detected leakage rate (observe local
standards and guidelines).
– Reduce the aperture of the air damper for
venting
– If the fault still exist: change main valve 2
Internal
information
Fuel train
R = 0, 0, 0, 0
Reset
Содержание CMS
Страница 1: ...www lamtec de Sensors and Systems for Combustion Engineering Manual Combustion Management System CMS...
Страница 2: ......
Страница 42: ...41 4 CMS Components 4 2 5 Terminal Assignment Fig 4 9 AEC TPS 230 VAC or 120 VAC terminal assignment...
Страница 131: ...130 7 Operating Control and Displays 7 1 5 5 Deleting Curves Delete firing rate curve...
Страница 142: ...141 7 Operating Control and Displays Accessing channel information AL1 Fig 7 12 GUI6xx channel information...
Страница 148: ...147 7 Operating Control and Displays Channel configuration AL1 Fig 7 18 Channel configuration...
Страница 154: ...153 7 Operating Control and Displays Accessing the CO O2 settings AL2 Fig 7 24 CO O2 settings menu...
Страница 157: ...156 7 Operating Control and Displays Fig 7 27 System CRCs menu...
Страница 162: ...161 7 Operating Control and Displays Fig 7 32 IP setting menu...
Страница 163: ...162 7 Operating Control and Displays 7 2 8 User Settings Accessing the display settings Fig 7 33 Display settings menu...
Страница 164: ...163 7 Operating Control and Displays Accessing the language settings AL1 Fig 7 34 Language settings menu...
Страница 166: ...165 7 Operating Control and Displays Fig 7 35 Installation...
Страница 167: ...166 7 Operating Control and Displays Fig 7 36 Installation...
Страница 176: ...175 7 Operating Control and Displays Fig 7 49 Loading a protected dataset into the device...
Страница 198: ...197 7 Operating Control and Displays 1 Digital inputs 2 Digital outputs 3 PLC Signals 4 Analogue measurement values...
Страница 202: ...201 7 Operating Control and Displays Replacing a Module Fig 7 81 Module replacement menu...
Страница 271: ...270 10 Maintenance 6 Close the window Connection between PC and CMS is established Indication of the con nected CMS...
Страница 272: ...271 10 Maintenance How to update the firmware in the CMS AL2 1 Open the menu Firmware update 2 Prepare firmware update...
Страница 274: ...273 10 Maintenance Activating the Debug Data 1 Start CMS Remote Software 2 Set device online 3 Show debug data...
Страница 276: ...275 10 Maintenance 3 Restart CMS to complete the update...
Страница 282: ...281 12 Appendix 12 5 EU Declaration of Conformity...
Страница 283: ...282 12 Appendix...