![Krone Big Pack 1270 XC Скачать руководство пользователя страница 269](http://html1.mh-extra.com/html/krone/big-pack-1270-xc/big-pack-1270-xc_original-operating-instructions_2004793269.webp)
Maintenance - General information
17
Checking/tensioning drive chains of the pick-up
17.5
BiG Pack 1270 XC
Original Operating Instructions 150000748_01_en
269
Tine rotor and auger conveyor
BP000-249
The drive chain of the tine and the auger conveyor (4) is located on the right side of the
machine. The spring (1) is preset to a dimension of
X=60 mm
.
ü
The machine is shut down and safeguarded,
.
Open the guard sheet on the right machine side.
Loosen the counter nut (3).
By tightening the nut (2), increase the tension of the spring (1).
Secure the nut (2) with the counter nut (3).
Close the guard sheet of the pick-up.
Shorten too long chains by removing a chain link.
Tine rotor
BP000-250
The chain drive of the tine rotor (4) is on the right and left machine side. The spring (1) is preset
to a dimension of
X=60 mm
.
ü
The machine is shut down and safeguarded,
.
Open the guard sheet on the right machine side.
Loosen the counter nut (3).
By tightening the nut (2), increase the tension of the spring (1).
Secure the nut (2) with the counter nut (3).
Close the guard sheet of the pick-up.
Shorten too long chains by removing a chain link.
Содержание Big Pack 1270 XC
Страница 29: ...Safety 2 Safety labels on the machine 2 5 BiG Pack 1270 XC Original Operating Instructions 150000748_01_en 29 ...
Страница 370: ...II T P LS I III IV T P S1 S2 M1 M2 V1 V2 P1 B1 A1 B2 B1 T1 T T4 P 180 bar B36 100 bar B11 B35 150101911_00 2 4 ...
Страница 372: ...B17 K9 K11 K12 B B1 A A1 1 2 3 K13 3 4 5 1 2 150101911_00 3 4 ...
Страница 374: ...B17 K11 1 2 150101911_00 4 4 ...
Страница 376: ... LUFXLW GLDJUDP GRFXPHQW QR YHUVLRQ ODUJH VTX XDUH EDOHU L 3 LJK 6SHHG XW 9DUL XW 3 3 1 0HGLXP RPIRUW IURP PDFKLQH QR ...