5
START-UP
56
OPTIFLEX 1300 C
www.krohne.com
01/2008 • 4000172301 - HB OPTIFLEX 1300 R02 en
Start-up
5.1 Start-up checklist
Check these points before you energize the instrument:
•
Are all the wetted components (probe, flange and gaskets) resistant to the product in the
tank?
•
Does the information on the signal converter nameplate agree with the operating data?
•
Did you correctly install the instrument on the tank?
•
Do the electrical connections agree with the national electrical codes?
5.2 Operating concept
You can read measurements and configure the device in 3 ways:
•
Digital display screen (optional).
•
Connection to a workstation or PC with PACTware
™
. You can download the Device Type
Manager (DTM) file from our download centre.
•
Connection to a workstation or PC with AMS
™
. You can download the Device Description (DD)
file from our download centre.
DANGER!
Before you energize the instrument, make sure that the polarity and the supply voltage are
correct.
DANGER!
Make sure that the instrument and the installation agrees with the requirements of the Ex
certificate of compliance.
HB_OPTIFLEX1300_EN_D4_080428.book Page 56 Tuesday, April 29, 2008 2:47 PM