・
Park the machine on the firm and level
ground to prevent overrun.
・
Put the working equipment like bucket and
dozer (if equipped) on the ground.
・
Secure the safety lock lever to "LOCKED"
position.
・
Perform the cool-down operation of engine
at low idling for 5 minutes.
・
Stop the engine by switching the starter
key switch off and then take out the key.
・
When leaving from the machine, close the
window, door of cab and all doors and
covers and lock them.
DD. LOOSE / UNSTABLE GROUND AFTER RAIN
Be careful for the possibility of machine rollover after rain.
The vibration and weight of the machine could cause shoulder of road or pathway to become loose or
unstable.
Inspect the areas where the machine will travel and operate on to assure safe operation is possible.
Pay attention for possible loosened precipice/overhang or shoulder of road, and falling rocks. Always
pay attention for unexploded dynamite on job sites where dynamite is used.
EE. SAFETY CHECK IN PARKING MACHINES
When the machine is not parked properly, there is a possibility of unexpected overrun, risks due to
barbarous act and dangerous movement at the time of the coming start.
Park the machine following the safety parking procedure shown below.
[
1. SAFETY PRECAUTIONS
]
1-32
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S2YF00022ZE01] [0731CsCshWbYs]
Содержание SK235SR-2
Страница 2: ...Copyright 2015 Kobelco Construction Machinery Co Ltd All rights reserved S2YF00022ZE01 0731CsCshWbYs...
Страница 6: ...Copyright 2015 Kobelco Construction Machinery Co Ltd All rights reserved S2YF00022ZE01 0731CsCshWbYs...
Страница 170: ...4 MAINTENANCE 4 2 Copyright 2015 Kobelco Construction Machinery Co Ltd All rights reserved S2YF00022ZE01 0731CsCshWbYs...
Страница 192: ...4 MAINTENANCE 4 24 Copyright 2015 Kobelco Construction Machinery Co Ltd All rights reserved S2YF00022ZE01 0731CsCshWbYs...