1.
Park machine on firm level ground, swing upper
structure so that drain plug (1) on the lower
section of hydraulic tank is positioned to the
mid point of right and left track shoe.
2.
Retract arm cylinder and bucket cylinder, place
bucket and blade (when installed) on the
ground and stop engine.
3.
Move safety lock lever to "LOCKED" position.
A: Valve
4
4.18
5000 HOUR INSPECTION & MAINTENANCE PROCEDURE
Thoroughly read and understand the "1.SAFETY PRECAUTIONS" of this MANUAL before operating or
servicing the machine.
Perform together with daily, 50-hour 120-hour, 250-hour, 500-hour and 1000-hour inspection and
maintenance.
A.
Change Hydraulic Oil
-Use extreme caution when removing the cover. The oil is under high pressure when hot.
Stop engine first, remove breather cap, press valve, release the pressure from tank, and then remove
cover.
-Immediately after operation, there is a hazard of getting burn because oil is hot. The filter should be
replaced after being cooled.
Since the deterioration of hydraulic oil with the breaker installed is larger than that of normal bucket
digging work, service it referring to the section "Checking and service" for hydraulic breaker.
・
Container for drain oil: 126 L {33 gal} or more
・
Changing oil quantity: 126 L {33 gal}
[
4. MAINTENANCE
]
4-77
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S2YF00022ZE01] [0731CsCshWbYs]
Содержание SK235SR-2
Страница 2: ...Copyright 2015 Kobelco Construction Machinery Co Ltd All rights reserved S2YF00022ZE01 0731CsCshWbYs...
Страница 6: ...Copyright 2015 Kobelco Construction Machinery Co Ltd All rights reserved S2YF00022ZE01 0731CsCshWbYs...
Страница 170: ...4 MAINTENANCE 4 2 Copyright 2015 Kobelco Construction Machinery Co Ltd All rights reserved S2YF00022ZE01 0731CsCshWbYs...
Страница 192: ...4 MAINTENANCE 4 24 Copyright 2015 Kobelco Construction Machinery Co Ltd All rights reserved S2YF00022ZE01 0731CsCshWbYs...