3.1.2 CHECKING BEFORE STARTING ENGINE
……………………………………………………………
3-4
3.1.3 ADJUSTING OPERATOR SEAT
…………………………………………………………………………
3-10
3.1.4 ADJUSTING MIRROR
………………………………………………………………………………………
3-11
3.1.5 CHECKING FUNCTION OF GAUGE CLUSTER
………………………………………………………
3-12
3.1.6 CHECKING WORK LIGHT
………………………………………………………………………………
3-12
3.1.7 STARTING ENGINE
………………………………………………………………………………………
3-13
3.1.8 STOPPING MACHINE ENGINE
…………………………………………………………………………
3-17
3.1.9 INSPECTION AFTER STARTING ENGINE
……………………………………………………………
3-18
3.1.10 MACHINE WARMING-UP
………………………………………………………………………………
3-20
3.1.11 SELECTION OF WORK MODE AND SWITCHING OF THE ATTACHMENT MODE
…………
3-22
3.1.12 CONTROLS DECAL
………………………………………………………………………………………
3-24
3.1.13 MACHINE OPERATION
…………………………………………………………………………………
3-25
3.1.14 PRACTICES TO IMPROVE EFFICIENCY
……………………………………………………………
3-34
3.1.15 FLAGMAN HAND SIGNALS
……………………………………………………………………………
3-37
3.1.16 PARKING THE MACHINE
………………………………………………………………………………
3-43
3.1.17 PRECAUTIONS AFTER OPERATION
…………………………………………………………………
3-44
3.1.18 MACHINE OPERATION IN ADVERSE WEATHER CONDITIONS
………………………………
3-45
4. MAINTENANCE
4.1 GENERAL INFORMATION
………………………………………………………………………………………
4-3
4.2 GENERAL SAFETY & PRECAUTIONS
……………………………………………………………………
4-5
4.3 LUBRICANT, FUEL & COOLANT SPECIFICATIONS
……………………………………………………
4-11
4.4 USE OF BIO-DEGRADABLE OILS
……………………………………………………………………………
4-13
4.5 MAINTENANCE PARTS
…………………………………………………………………………………………
4-14
4.6 TORQUE VALUES FOR SPECIFIED
…………………………………………………………………………
4-15
4.7 TORQUE SPECIFICATIONS FOR BOLTS & NUTS
………………………………………………………
4-17
4.8 TORQUE SPECIFICATIONS FOR JOINTS & HYDRAULIC HOSES
……………………………………
4-20
4.9 INSPECTION & MAINTENANCE CHART
……………………………………………………………………
4-22
4.10 WHEN REQUIRED
………………………………………………………………………………………………
4-26
4.11 PRE-START (EVERY 8 HOURS) INSPECTION & MAINTENANCE
……………………………………
4-34
4.12 50 HOUR (WEEKLY) INSPECTION & MAINTENANCE PROCEDURES
………………………………
4-36
4.13 120 HOUR INSPECTION & MAINTENANCE PROCEDURE
……………………………………………
4-41
4.14 250 HOUR (3-MONTH) INSPECTION & MAINTENANCE PROCEDURE
……………………………
4-44
4.15 500 HOUR INSPECTION & MAINTENANCE PROCEDURES
…………………………………………
4-53
4.16 1000 HOUR (12-MONTH) INSPECTION & MAINTENANCE PROCEDURES
…………………………
4-64
4.17 2000 HOUR INSPECTION & MAINTENANCE PROCEDURES
…………………………………………
4-68
4.18 5000 HOUR INSPECTION & MAINTENANCE PROCEDURE
……………………………………………
4-77
4.19 MACHINE STORAGE
…………………………………………………………………………………………
4-79
5. TRANSPORTATION
5.1 GROUND TRANSPORTATION
…………………………………………………………………………………
5-3
5.1.1 MACHINE PREPARATION
…………………………………………………………………………………
5-3
5.1.2 LOADING/UNLOADING THE MACHINE
………………………………………………………………
5-5
5.1.3 SECURING THE MACHINE
………………………………………………………………………………
5-8
5.2 LIFTING MACHINE
………………………………………………………………………………………………
5-10
5.3 INSTALLATION AND REMOVAL OF MIRROR FOR SAFETY
…………………………………………
5-12
[
CONTENTS
]
2
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S2YF00022ZE01] [0731CsCshWbYs]
Содержание SK235SR-2
Страница 2: ...Copyright 2015 Kobelco Construction Machinery Co Ltd All rights reserved S2YF00022ZE01 0731CsCshWbYs...
Страница 6: ...Copyright 2015 Kobelco Construction Machinery Co Ltd All rights reserved S2YF00022ZE01 0731CsCshWbYs...
Страница 170: ...4 MAINTENANCE 4 2 Copyright 2015 Kobelco Construction Machinery Co Ltd All rights reserved S2YF00022ZE01 0731CsCshWbYs...
Страница 192: ...4 MAINTENANCE 4 24 Copyright 2015 Kobelco Construction Machinery Co Ltd All rights reserved S2YF00022ZE01 0731CsCshWbYs...